RePG Generates Electricity at 100 ° C Waste Heat in Heavy Industry!
RePG Energy production from waste heat in industrial environments starts at 0 °C, not 120 °C! Installation costs are very low and it offers high efficiency.
RePG Energy production from waste heat in industrial environments starts at 0 °C, not 120 °C! Installation costs are very low and it offers high efficiency.
With RePG energy systems, natural energy resources of Turkey, “Sun-thermal” and “Geo-Thermal” are becoming energy sources. Turkey can become a country that can export energy thanks to 100% domestic and infinitely renewable sources of energy within 5 years.
RePG Energy’s target for 2025 is to provide 2GW – 2.5GW energy production and recovery with the RePG 10kW system in 250 thousand residences/workplaces. In addition, to be able to provide 6.5 – 8GW energy production to our country at total by allowing 4.5 – 6GW energy production at 150 thousand of 25 – 100kW systems installed in our country for Industry and Geothermal usage.
Thanks to the Natural Gas Boiler in the hotel, if the “Hot Water” supplied to the hotel is connected to the RePG System’s hot water inlet, the RePG System can operate as an uninterrupted power supply mechanism. Thanks to the 24/7 Continuously Operating Natural Gas Boiler, the RePG System can operate as a “STEAM TURBINE”.
Pipeless Water Transfer is Possible with RePG! We talked with Hasan Ayartürk, Founder of RePG Energy Systems regarding what RePG will do about Industry Innovation and infrastructure.
RePG Industrial or Residential systems use intensive waste heat for power generation systems that require 80-90% less space at installation for equal energy output.
RePG Energy provides efficient electricity generation from very intense waste heat at 0 – 40 °C, 40 – 60 °C, and over 60 °C with its special patented technology.
RePG generates electricity from very-low or low-intensity waste heat below 90 °C in factories, workshops, and workplaces in the light industry.
Thanks to RePG, houses in Afyon, Izmir, and their close area will be able to generate electricity through geothermal hot water for 12 months.
RePG technology provides electricity generation from geothermal hot water above 100 °C at 70 – 90% less cost than conventional ones.