RePG Instant Energy Data
You can follow instant and total energy production quantities of RePG Industry and Residence products that are installed in different locations including both Turkey and overseas.
The energy generation performance of RePG Energy Systems will continue to increase steadily since the aggressive R&D studies are ongoing.
* BETA systems abroad will transmit and display data on February 2021 at the earliest.
Instant Live Data from All Installed Systems
Total Energy Produced
kWh
0
MWh
0
GWh
0
Instant Power
W
0
kW
0
MW
0
0
GMT +3
Total Number of Active Locations
0
Total Number of Active Systems
0
Total energy produced between November 2018 - June 2020 (20 Months): 12 Megawatts (Bursa, Sivas, Ankara, Adana) Beta Systems were initiated at the TRL 5-6 Test level.
During this 2-year R&D and BETA product development period, we achieved to generate 4 times of energy in 1/4 time.
Total energy generated between July 2020 and November 2020 (5 months): 48 Megawatts (Bursa, Istanbul, Izmir, Tekirdağ, Sivas, Adana) Beta Systems were initiated at the TRL 6-7 level.
Until the end of 2020, our total energy generation target is 70 Megawatts and our instantaneous installed power target is 40 kWh.
Our total energy production target for the end of 2021 is 5 Gigawatts! Our instantaneous installed power target will be 5 megawatts.